Prior to installation

Inspecting the goods before laying

Check all flooring elements in daylight for visible faults.
Boards showing visible defects before installation should not be used.
Contact your supplier to report the defect according to the warranty conditions.
Please note: Boards that have already been installed will not be exchanged.

Storage and acclimatisation

Leave the floor covering to acclimatise in the same environmental conditions as the installation area for a period of at least 48 hours prior to installation. Always store the boards flat and cross-stacked, in their original unopened boxes and at approx. 15-25 °C and between 35 % and maximum 65 % relative humidity.

Tools required for Installation

The list below gives the tools that might be necessary. It is not exhaustive and not all tools are needed depending on the type of MMF floors to be installed. • Meter measure / measuring tape

  • Pencil
  • Angle measuring tool
  • Utility knife
  • Spacer wedge
  • Laminate cutter
  • Tapping block
  • Rubber Hammer
  • Saw
  • Cutting machine
  • Bevel
  • Hand roller
  • Optional: Metal saw for cutting metal rails to size, mitre-cutting saw for cutting the strips to size.